•        OUR COMPANY
  •        PRODUCTS
  •        SERVICES
  •        Q&HSE
  •        NEWSROOM
 
Newsroom
Novomet » Newsroom » News
December 07, 2012

ESP of 319 series with bypass system was successfully installed in a well with casing OD 7”, oil field Copa B3, Colombia in November 2012.

Equipment is designed upon specified requirements of Colombian customer – company Petromagdalena (Pacific Stratus).  Besides the main function of equipment (oil production by means of electric centrifugal pump) the customer requested an access to space below the ESP in order to activate/de-activate packer system with a special fishing tool. Equipment design developed by our company complies with customer’s requirements. It allowed to successfully conduct all required operations with packer system and perform well logging for determination of fluid-movement profile in this well.

 
   
 
© 2016 NOVOMET